Friday, November 30, 2012

Red Trellis Tam #8

Row30 - 45

Two rows or so past the third cable decrease row
P2, k1, k2 tog, k1 around

I am starting to run out of yarn so I will add a new red yarn, introducing it every other row so if the dye lot is not the same the color will blend. The only other option is to finish the tam off and then it might be too small.
See photo.

Thursday, November 29, 2012

Red trellis tam #7

Row 29 and 30 shown in this photo

Red Trellis Tam #6

Row 14. Cable row = 102 stitches
Move the rest of the purl stitches so they are arranged:
K2, P4

Row 15.increase k2, cable the knits. P2,m1P, P2
Knit around (knitting the knits and purling the Ps)

Row 16 Knit around

Row. 17 knit around

Row 18 move the purl stitches as you did before k1, p2, k1, p3

Row 19 move two more purl stitches
K1, p1, k1, p4, k1. See photo

Row 20 knit around. P4, K3
Row 21 P4, K2, m1 K, K1
Row 22 P4, cable 2 forward k2, K2 from cable needle
Row 23 - 28 knit around
Row 29 decrease p2 tog twice, K4
Row 30 P4 cable (same as row 22)

Knit Along Red Trellis Tam #5

Row 12 cable row
Knit, 2 purl, knit.
\ . . / . . \ . . / . .

Row 13 knit around
K, p2, k, p2

Knit Along Red Trellis Tam #4

Row 9 K2, P3

Row10 cable the knit stitches, p1, m1p, p2. Increase row

Row11 k2, P4

Knit Along Red Trellis Tam #3

Row 8 K2, P2 ( m1 p) increase

Knit Along Red Trellis Tam #2

Row 3 Cable the knit stitches
As shown in photo

Row 4 knit around knitting the knit stitches through the back twisting the stitches to make the cable stitches more crisp and stand out.
Row5 knit around follow the pattern as seen knitting and purling.

Row 6 cable moving the knit stitches over the purls as shown in the next photo. I will post again after Row 6 and 7 which are knit as seen.

Knit along trellis tam

Trellis Tam
Worsted weight wool in red
Holding #4 ndls together
cast on 68 stitches

Transfer stitches to 16in circular # 7 needles k2, p2 Ribb for 2 rows.

Wake up kitty

Poor old Bob my big Tom cat is hiding from the morning light. He is on the corner of my bed and does not look like he is ready for the day to begin.

I have to get my knitting inventoried and ready for display at the Dragon Fly Studio this week end. I wish I had more items finished but my fascination with making things with more complex designs means every item took many more hours to complete than the things I was making before on big needles. I am working on finishing up some mittens today. I will post pictures later.

Sunday, November 25, 2012

Still knitting

Some of my knitted accessories will be in a exhibit. Everyone is invited.

ART SHOW and SALE at the
DRGONFLY STUDIO
135 Pink Road
Slippery Rock PA
Sat. Dec. 1 10 am - 4 pm
Sun. dec 2, 1 - 4 pm

Work by Nancy Kneupper, Barbara Wukich, Nancy Griffin , Diane Bowser and Tamila Normand

Call 724-794-6317 to confirm if the weather is bad.